In June 2016 UIP had awarded the design review, modifications and construction drawings preparation of the Mein River Hydro-plant Project to CCEG, which had subcontracted ADEC for the full electro-mechanical scope.
Project Data:

o Turbine Type: Francis Spiral Turbine with direct coupled Generator and Flywheel
o No. of Turbines: 3 Units
o Gross Head: 60 m
o Turbine Discharge: 1.2 m 3 /sec
o Turbine speed: 1000 rpm
o Turbine Output: 370 kW
o Generator Output: 335 kW

ADEC had performed the following tasks:

o Design review of the electromechanical works.
o Design modifications that were needed during the review.
o Technical review and evaluation of Vendor’s submittals.
o Preparation of electromechanical works construction drawings.

Client Name

USAID - Liberian Energy Sector Support Program/ UIP

Project Size

Confidential